A PRELIMINARY CHRONOLOGICAL CHECK LIST OF UPGRADES AND REPAIRS
By Eric Krause
Krause House Info-Research Solutions
November 14, 2008
Floor Plans (Source)
MAIN HOUSE
Colonial to Georgian House (1700 - 1830).
Additional research may add or delete upgrades or repairs.
Date |
ELEMENT Common Name/Room Number/Geographic Location |
Upgrade/Repair |
|
|
|
|
EXTERIOR |
|
|
|
|
Pre-1995 |
South Facade |
Installation of the small window for Room 204. |
Pre-1995 |
North Facade |
*The installation of a north pitch roof gutter with two downspouts. |
Pre-1995 |
South Facade |
*The installation of a south pitch roof gutter with two downspouts. |
Pre-1995 |
North Facade |
*The installation of a pipe for the north east downspout to lead water onto the sidewalk. |
Pre-1995 |
North facade |
Installation and removal of an unknown feature above transom of the the central doorway. |
Post-1995 |
South Facade |
The installation of a pipe for the south east downspout to lead water away from the house. |
Post-1995 |
South Facade |
The installation of a leader for the south west downspout to lead water away from the house. |
Pre-1995 |
West Facade |
*The detail on the trim at the corner boards and the raking on the west facade were altered from their original 19th-century design. |
Pre-1995 |
West Facade |
*A large crack to the north of the sandstone infill of the west facade was repaired with mortar. |
Pre-1995 |
South Facade |
*The wall was shingled. |
Date Unknown |
South Facade |
The back bands of the windows for Room 103, Room 108, Room 203, Room 205, and Room 206 went missing. |
Pre-1995 |
South Facade |
Installation of exterior hood over Room 203 window above the Exterior Basement Stairwell. |
1994 |
South Facade |
Some wall shingles associated with the repair of the head of the window of Room 203 were replaced. |
Date Unknown |
South Facade |
A portion of the wall was re-shingled. |
Pre-1995 |
West Facade /North Facade |
*The west face of the north-west pilaster was replaced with its back band trim, etc. not matching its north face. |
Pre-1995 |
West Facade |
*The frieze board of the north-west pilaster was replaced. |
Pre-1995 |
North Facade |
*The downspout has been cut into [the] far trim [i.e. into the north facade of the capital of the north-west pilaster]. |
Pre-1995 |
South Facade |
*The sills and board water table [skirting board] were repaired. |
Pre-1995 |
East Facade |
*The south-east corner post, and possible at this time its corner board and crown mouldings were repaired (mismatched with the north-east corner post and west facade). |
Date Unknown |
East Facade |
The plinth, which would have been nailed to the skirting board, of the south-east pilaster went missing. |
Date Unknown |
East Facade |
The pilaster was repaired near the bottom without the covering back bands showing any similar repair. |
Pre-1995 |
East Facade |
*The board water table in the middle of the wall was cut and lapped with an non-matching piece. |
Post-1995 |
East Facade |
Installation of a vent in the roof gable. |
Post-1995 |
West Facade |
Installation of a vent in the roof gable. |
1999, Summer |
East Facade |
The downspouts were extended and re-directed. |
|
|
|
|
EXTERIOR FOUNDATION |
|
|
|
|
Pre-1995 |
North Facade |
*Stucco [rendering] was applied to its brick topping. |
Pre-1995 |
West Facade |
*Five large sandstone stones, including smaller blocks to the north, were placed in the foundation in the south-west corner, west facade, to fill in an opening [See Exterior Basement Stairwell]. |
Pre-1995 |
West Facade |
The brick and sandstone portion was rendered. |
Post-1995 |
West Facade |
The rendering over the sandstone portion was removed. |
Pre-1995 |
East Facade |
The brick portion was rendered. |
2006, September |
Foundation |
Squirrel hole in foundation presumably closed off. |
|
|
|
|
EXTERIOR |
|
|
|
|
Pre-1995 |
North Pitch |
The original sheathing was replaced with a new, elevated, sheathing. |
Pre-1995 |
South Pitch |
The original sheathing was replaced with a new, elevated, sheathing. |
1994 |
North Pitch |
*Re-sheathed with asphalt shingles. |
1994 |
South Pitch |
*Re-sheathed with asphalt shingles. |
Pre-1995 |
South Pitch |
*The bell cast of the roof has been taken out on the east [south?] face [pitch] explaining the scabs [furring strips nailed to the sides, as well as strips of wood on top of the rafters] on the roof rafters [i.e. The bell was produced with short timbers called sprockets or cocking pieces affixed to the feet of the rafters. Those of the south facade were removed.] |
2006, May |
South Pitch |
Re-sheathed with asphalt shingles following damage from a winter windstorm to shingles already sun-baked. |
|
|
|
|
CHIMNEY |
|
|
|
|
Pre-c.1995 |
West Chimney |
*The exterior stack was re-built in new, non-historical, high fire, brick work that was stuccoed (non-historical rendering). |
Pre-1949 |
West Chimney |
The exposed brick stack was stuccoed (rendered). |
Pre-1949 |
West Chimney |
*Installation of an inappropriate exterior chimney cap that did not match the original historical cap. |
Pre-c.1995 |
East Chimney |
*The exterior stack was re-built in new, non-historical, high fire, brick work that was stuccoed (non-historical rendering). |
Pre-1949 |
East Chimney |
The exposed brick stack was stuccoed (rendered). |
Pre-1949 |
East Chimney |
*Installation of an inappropriate exterior chimney cap that did not match the original historical cap. |
1996 |
West Chimney |
A 6"diameter SS [stainless steel] chimney liner was placed. |
1996 |
West Chimney |
There may have been some brick replacements. |
1996 |
West Chimney |
The chimney top was arranged with a cap and wire mesh to prevent entry of pigeons and small mammals. |
1996 |
East Chimney |
The chimney top was arranged with a cap and wire mesh to prevent entry of pigeons and small mammals. |
2002 |
West Chimney |
The chimney above the roof line was re-pargetted (re-parged). |
2002 |
East Chimney |
The chimney above the roof line was re-pargetted (re-parged). |
2006 |
West Chimney |
Caulking applied to the lead chimney flashing (some leakage had been seen in the attic). The property chairman was assured that the flashing did not need to be replaced. |
|
|
|
|
BASEMENT |
|
|
|
|
Pre-1995 |
Room 001/ South West of Stairwell |
*Five large sandstone stones, including smaller blocks to the north, were placed in the foundation in the south-west corner, west facade, to fill in an opening [See Exterior Basement Stairwell]. |
Pre-1995 |
Room 001 /North West of Stairwell |
The east wall, with its doorway, of the plastered room was removed. |
Date Unknown |
Room 001/ North West of Stairwell |
Some brick repairs in the north wall, north-west portion, occurred in the brick topping of the foundation. |
Pre-1995 |
Room 001/ South East / South of Stairwell |
Some of the original joists under Room 103 were removed. [CHECK HOW MANY WERE REMOVED] *New flooring, strapped joists (2" x 8", c. 30" on centre), supported by a c. 10' horizontal beam (6"x6"), set upon two steel vertical lally column posts, were introduced to support Room 103, but this framing was was not secured to one another. |
Pre-1995 |
Basement |
*All the vertical framing in the basement has been replaced with new wood posts [9] and new concrete piers poured under the posts. |
1999 |
Basement |
New wood posts were introduced upon poured concrete piers and the steel vertical lally column posts were re-located. |
Date Unknown |
Room 001/ South East of Stairwell |
Modern joist work introduced west of the fireplace base. |
Spring 2000 |
Room 001/ South East of Stairwell |
The new beam work under Room 103 was properly completed. |
Post-1995 [Spring 2000?] |
Room 001/ South East of Stairwell |
North ends of flooring joists were supported on metal ledgers at the fireplace base. |
Pre-1995 |
Room 001/ South East of Stairwell |
The hearth cradle was removed from beneath Room 103. |
Date Unknown |
Room 001/ South of Stairwell |
Boards were nailed along the joints of the flooring boards under Room 108. |
Date Unknown |
Room 001/ South of Stairwell |
Modern floor joists were inserted between the original joists under Room 108, together with new boards nailed along the joints of the flooring boards. |
Date Unknown |
Room 001 |
The brick foundation portion was perhaps rendered before being whitewashed. |
Pre-1995 |
Room 001 |
*A new vapour barrier [sheet polyethylene] and gravel [crushed stone] has been installed on the floor. |
Pre-1995 |
Room 001/ North East of Stairwell and North West of Stairwell |
*A new flooring beam was placed, running east-west, to support the floors of the Room 101 and Room 109 (See vertical wooden floor beam support posts). Some additional modern joists were also added. |
Date Unknown |
Room 001/ North East of Stairwell |
Two brick piers, to the sides of the basement window, were placed on the east foundation ledge. |
Date Unknown |
Room 001/ North East of Stairwell |
Cement work was introduced in the east wall beneath the basement window. |
Date Unknown |
Room 001/ North East of Stairwell |
The east wall basement window was hinged. |
Date Unknown |
Room 001/ North East of Stairwell |
The east wall basement window was barred. |
Pre-1995 |
Room 001/North West of Stairwell |
The east wall of the finished room was removed. |
Date Unknown |
Room 001/North West of Stairwell |
Conservation efforts that included netting were taken to preserve the ceiling of the finished room |
Date Unknown |
Room 001/South of Stairwell |
A nailer secured against an original joist under Room 107 to support the original flooring boards above. |
Date Unknown |
Room 001/South of Stairwell |
A paired modern floor joist inserted between the original joists under Room 107 to support the new flooring boards above. |
1993, September |
Room 001/ South West of Stairwell |
*Remedial action [reconstruction] was taken to re-support the recently collapsed hearth of the fireplace of Room 109 above, but upgrading required |
c. 2007 |
Room 001/ South West of Stairwell |
Final action was taken to upgrade the collapsed hearth of the fireplace of Room 109 above, with new materials. |
|
|
|
|
BASEMENT |
|
|
|
|
Date Unknown |
- |
The east wall was lathed and plastered. |
Date Unknown |
- |
The ceiling above the top landing was lathed and plastered. |
Date Unknown |
|
The lath and plaster was removed from the ceiling above the top landing. |
Date Unknown |
- |
A modern, wider, staircase replaced a former one to the basement. |
Pre-1995 |
- |
*The stairs [treads of the basement staircase] were replaced with new pine boards. |
Date Unknown |
- |
A doorway at the top of the basement staircase in the south wall was cut into an existing board partition between it and Room 107. |
Date Unknown |
- |
The doorway to Room 107 was blocked with a door panelled on the basement stairwell side and with vertical boards on the other. |
|
|
|
|
EXTERIOR BASEMENT |
|
|
|
|
Pre-1995 |
West Facade, South West |
*Five large sandstone stones, including smaller blocks to the north, were placed in the foundation in the south-west corner, west facade, to fill in an opening. Possible Earlier Basement Stairwell |
Date Unknown |
Existing Stairwell |
Recent pointing of the side rubble stone walls has occurred. |
Date Unknown |
Existing Stairwell |
Concrete side walls were poured to raise the opening higher. |
Pre-1995 |
Existing Stairwell |
Present exterior hatch (bulkhead) was installed. |
Date Unknown |
Existing Stairwell |
Present interior door was installed. |
|
|
|
|
FIRST FLOOR |
|
|
|
|
|
|
|
Pre-1995 |
Living (DeWolf Parlour) Room /Room 109 /North West |
Interior wooden inserts covering over another detail placed beneath the windows. |
Pre-1995 |
Front (Main) Hall /Room 110 /North |
*The original flooring was covered over in hardwood running east-west. |
Pre-1995 |
Front (Main) Hall /Room 110 /North |
Wooden inserts were placed in the bottom two exterior panels of the front door . |
Pre-1984 |
Front (Main) Hall /Room 110 /North |
The present south partition wall with a doorway was installed adjoining Room 107. |
Pre-1995 |
Front (Main) Hall /Room 110 /North |
The hardwood flooring was installed. |
Date Unknown |
Front (Main) Hall /Room 110 /North |
A baseboard insert was installed in the west baseboard near its southern terminus. It predates the west architrave (surround) of the doorway to Room 107. |
Pre 1984 |
Front (Main) Hall /Room 110 /North |
An earlier entranceway was perhaps replaced with the present doorway, door, transom and side-lites. |
Pre-1995 |
Back Sitting Room (Study) /Room 108 /South West |
*The chair rail housing on the south wall was replaced. |
Pre-1984 |
Back Sitting Room (Study) /Room 108 /South West |
A wall or a wall with a doorway was removed east of the fireplace chimney-piece. |
Pre-1984 |
Back Sitting Room (Study) /Room 108 /South West |
The present north partition wall with a doorway was installed adjoining Room 110. |
Pre-1995 |
Back Sitting Room (Study) /Room 108 /South West |
A doorway or a wall was removed east and opposite of the fireplace. |
Date Unknown |
Back Sitting Room (Study) /Room 108 /South West |
To the west and east of the fireplace the area was boxed in, perhaps hiding the complete design of the fireplace chimney-piece. |
Date Unknown |
Back Sitting Room (Study) /Room 108 /South West |
South window was masked. |
Date Unknown |
Back Sitting Room (Study) /Room 108 /South West |
The fireplace opening was blocked. |
Date Unknown |
Back Sitting Room (Study) /Room 108 /South West |
The fireplace hearth bricks were removed and replaced with planks. |
Date Unknown |
Back Sitting Room (Study) /Room 108 /South West |
The original shelf(ves) in the closet was removed. |
Date Unknown |
Back Sitting Room (Study) /Room 108 /South West |
Strips of wood were pounded between the joints of the flooring boards. |
Pre-1984 |
Kitchen /Room 103 /South East |
The removal of a portion of the south wall to allow access to the South Ell. |
Pre-1995 |
Kitchen /Room 103 /South East |
The room was reduced in size to the north with the installation of the Kitchen Stairwell |
Pre-1995 |
Kitchen /Room 103 /South East |
* The South Ell roof begins to leak water into this room. |
Pre-1995 |
Kitchen /Room 103 /South East |
*A new [plaster] ceiling was installed. |
Pre-1995 |
Kitchen /Room 103 /South East |
An added flooring of narrow boards was installed over an earlier board flooring. |
Pre-1995 |
Kitchen /Room 103 /South East |
*Some [lower] flooring boards were replaced. |
Date Unknown |
Kitchen /Room 103 /South East |
The fireplace hearth was removed. |
Pre-c.1995 |
Kitchen /Room 103 /South East |
*The fireplace [not the oven] was re-bricked. |
Pre-1995 |
Kitchen /Room 103 /South East |
*The fireplace flue was plugged. |
Pre-1995 |
Kitchen /Room 103 /South East |
*The ceiling was repaired following damage by water from leaks from above, from the roof of the South Ell. |
Date Unknown |
Kitchen /Room 103 /South East |
The doorway to the Kitchen Stairwell was narrowed with the creation of a new west jamb utilizing a portion of the former door. |
Pre-1984 |
Kitchen /Room 103 /South East |
The closet was created in the south west corner of the room. |
Pre-1995 |
Room 102 /Passageway |
*The flue was plugged. |
Date Unknown |
Room 102 /Passageway |
An added flooring of boards was installed over an earlier flooring. |
Date Unknown |
Room 102 /Passageway |
The ceiling was plastered where a stairwell opening perhaps once existed. |
Date Unknown |
Room 102 /Passageway |
The flooring fronting the east fireplace mass was repaired (not a hot or return air register) |
Date Unknown |
Room 102 /Passageway |
The ceiling was plastered above the repaired flooring. |
Date Unknown |
Room 101 /Dining Room /North East |
The fireplace was re-bricked. |
Pre-1984 |
Room 107 /Rear Hall /South |
The present north partition wall with a doorway was installed adjoining Room 110. |
Pre-1995 |
Room 107 /Rear Hall /South |
*The original first layer of flooring boards was replaced in large part. |
Pre-1995 |
Room 107 /Rear Hall /South |
The top layer of flooring boards was replaced in large part. |
Date Unknown |
Room 107 /Rear Hall /South |
A doorway was cut in the north board partition wall between it and the Basement Stairwell. |
Date Unknown |
Room 107 /Rear Hall /South |
The doorway to the basement in the north board partition wall was blocked with a door with vertical boards on this side and panelled on the other. |
Pre-1995 |
Living (DeWolf Parlour) Room /Room 109 /North West |
A doorway already existed or was installed in the south wall. |
Date Unknown |
Living (DeWolf Parlour) Room /Room 109 /North West |
An expected boxed "corner post" in the north-west corner may have been removed. |
Date Unknown |
Living (DeWolf Parlour) Room /Room 109 /North West |
The fireplace was re-bricked? |
Date Unknown |
Living (DeWolf Parlour) Room /Room 109 /North West |
The fireplace floor was rendered? |
Date Unknown |
Living (DeWolf Parlour) Room /Room 109 /North West |
The fireplace hearth was re-bricked? |
Date Unknown |
Room 101 /Dining Room /North East |
The fireplace was re-bricked? |
Date Unknown |
Room 101 /Dining Room /North East |
The fireplace floor was rendered? |
Date Unknown |
Room 101 /Dining Room /North East |
The fireplace hearth was re-bricked? |
Date Unknown |
Room 101 /Dining Room /North East |
The bottom sash of the two north double-hung windows were replaced?. |
|
|
|
|
MAIN |
|
Pre-1995 |
- |
Constructed was the first staircase. |
Pre-1995 |
- |
Constructed was the existing staircase to replace the first steeper one. |
Date Unknown |
|
The "summer" beam was boxed with boards. |
Pre-1995 |
- |
*The balusters and handrail around the stair well were altered. The balusters on the guardrail at the second floor are turned balusters with squared ends whereas the balusters on the stairway are cylindrical. |
Pre-1995 |
- |
*Removed was an earlier newel post or rail support at the Second Floor. |
|
|
|
|
KITCHEN |
|
Date Unknown |
|
A stairwell centred upon the Attic Stairwell was floored over partially with boards. The stairs of the attic stairwell may have continued downwards. |
Date Unknown |
- |
The installation of a relatively steep staircase, that utilized cut-nails, off Room 103 with a first-floor door to Room 103. |
Date Unknown |
- |
The south header was cut back at an angle, no doubt to increase head-room. |
Pre-1995 |
- |
The existing staircase, utilizing wire-nails, replaced the lower part only of the earlier one. |
Date Unknown |
- |
The first-floor doorway to Room 103 was narrowed with the creation of a new west jamb utilizing a portion of the former door. |
|
|
|
|
SECOND FLOOR |
|
|
|
|
Pre-1995 |
Bedroom Room 201 North East |
*Interior wooden inserts covering over another detail placed beneath the windows. |
Pre-1995 |
Centre Hall (Upstairs) /Room 205 /South |
*Removed was perhaps a wall running north-south at the top of the stairs enclosing the hallway back around the rail. |
Pre-1995 |
Bedroom /Room 206 /South West |
*Interior wooden inserts covering over another detail placed beneath the windows. |
Pre-1995 |
Main Bedroom (Patriquin) /Room 207 /North West |
Interior wooden inserts covering over another detail placed beneath the windows. |
Pre-1995 |
Sewing Room /Room 208 /North |
Interior wooden inserts covering over another detail placed beneath the windows. |
Pre-1995 |
Bathroom /Room 204 |
Bathroom [a former kitchen chamber?] was installed and Rooms 203 was reduced in size. |
Date Unknown |
Bathroom /Room 204 |
The chair rail along the south wall was removed. |
Date Unknown |
Bathroom /Room 204 |
The north partition wall was lath and plastered. |
Pre-1995 |
Bedroom Room 201 North East |
Installation of the existing board partition in the closet backing Room 203. |
Pre-1995 |
Bedroom /Room 203 /South East |
Installation of the existing board partition in the closet backing room 201. |
Pre-1995 |
Hall /Room 202 |
The door to the attic was replaced was replaced with the existing one. |
Date Unknown |
Hall /Room 202 |
A stairwell opening was filled in with flooring boards. |
Date Unknown |
Hall /Room 202 |
The flooring fronting the existing stairwell (not a hot or return air register) was filled in with flooring boards. |
Pre-1995 |
Centre Hall (Upstairs) /Room 205 /South |
*There is evidence on the west wall of a possibly removed door through to the closet [Connector room between rooms 206 and 207] next to the chimney. |
Pre-1995 |
Centre Hall (Upstairs) /Room 205 /South |
The doorway in the west wall to Connector Room between Rooms 206 and 207 was blocked, no doubt lathed and plastered, and a replacement baseboard inserted. |
Date Unknown |
Connector room between rooms 206 and 207 |
A doorway was inserted in the south partition wall within the closet to create a connecting room. |
Date Unknown |
Bedroom /Room 206 /South West |
A doorway was inserted in the north partition wall to create a connecting room. |
Date Unknown |
Bedroom /Room 201 /North East |
Drywall ceiling was installed. |
Pre-1995 |
Hall /Room 202 |
Drywall ceiling was installed. |
Date Unknown |
Bedroom /Room 203 /South East |
Drywall ceiling was installed. The original laths and plaster were apparently removed. |
Date Unknown |
Bedroom /Room 203 /South East |
One window opening was reduced in height. |
Date Unknown |
Bedroom /Room 203 /South East |
The closet doorway was narrowed and lowered. |
Pre-1995 |
Bathroom /Room 204 |
Installation of a small window in the south wall. |
Date Unknown |
Bathroom /Room 204 |
Drywall ceiling was installed. |
Date Unknown |
Centre Hall (Upstairs) /Room 205 /South |
Drywall ceiling was installed. |
Date Unknown |
Bedroom (Children's) /Room 206 /South West |
Drywall ceiling was installed. |
Date Unknown |
Main Bedroom (Patriquin) /Room 207 /North West |
Drywall ceiling was installed. |
Date Unknown |
Sewing Room /Room 208 /North |
Drywall ceiling was installed. |
1994 |
Bedroom /Room 203 /South East |
The head of the south window was replaced. |
Pre-1995 |
Main Bedroom (Patriquin) /Room 207 /North West |
The fireplace floor was rendered, and its hearth was re-bricked. |
Pre-1995 |
Bedroom /Room 201 /North East |
The face of the fireplace was rendered. |
Date Unknown |
Bedroom /Room 201 /North East |
The fireplace floor was rendered. |
Date Unknown |
Bedroom /Room 201 /North East |
The fireplace hearth was re-bricked. |
Pre-1995 |
Main Bedroom (Patriquin) /Room 207 /North West |
The face of the fireplace was rendered. |
Date Unknown |
Bedroom (Children's) /Room 206 /South West |
The face of the fireplace was rendered. |
Date Unknown |
Bedroom /Room 206 /South West |
The flooring fronting the fireplace was repaired (not a hot or return air register). |
Date Unknown |
Bedroom /Room 206 /South West |
The fireplace floor was rendered? |
Date Unknown |
Bedroom /Room 206 /South West |
The hearth was re-bricked?. |
Date Unknown |
Bedroom /Room 203 /South East - Closet |
Five boards were nailed (wire nails), the length of the run, to the bottom of the stairs. |
Date Unknown |
Main Bedroom (Patriquin) /Room 207 /North West |
The top layer of the flooring boards was installed after the installation of the fireplace chimney piece and baseboards. |
Pre-1995 |
Hall /Room 202 |
The existing stairs guardrail was installed. |
|
|
|
|
ATTIC |
|
|
|
|
Date Unknown |
|
Present stairway stingers replaced a steeper earlier set of stringers? |
Date Unknown |
|
The installation of the present risers and older treads upon the stairway stingers. |
Date Unknown |
- |
Re-used boards installed, nailed to the north wall, east of the chimney stack, with cut nails |
Date Unknown |
- |
New treads, upon older ones with their noses removed, were installed, nailed with wire nails. |
Date Unknown |
- |
The removal of an earlier newel post? |
Date Unknown |
- |
The existing guardrails were installed. |
Date Unknown |
- |
The south face of the fireplace chimney was rendered with mortar. |
|
|
|
|
ATTIC |
|
|
|
|
Pre-1995 |
Room 303 /North West |
*The sash and frame were replaced. |
Date Unknown |
Attic |
Possible rafters were removed. |
Pre-1995 |
Attic |
*New collar-tied roof rafters [of a lesser depth than the existing nine ones] were introduced [perhaps where 14 former narrower rafters of the same depth once existed] between the original collar-tied rafters producing a framing system set upon c. 20 inch centres. |
Date Unknown |
Attic |
Spikes were driven into three of the south-side rafter connections where their half-dovetail lapped, mortise and tenon connections were pulling away, and one connection has a wooden block nailed at the lap. |
Pre-1995 |
Attic |
*Both the new framing and the old framing have been scabbed [furring strips nailed to the sides, as well as strips of wood on top of the rafters] on the north face [pitch] for what appears to be an attempt to provide a level plane .... For the new sheathing [for a new roof covering] this is not the case on the south face [pitch], although some scabbing [furring strips nailed to the sides, as well as strips of wood on top of the rafters] occurs but intermittently. |
Date Unknown |
Attic? |
The area may have been have used it as temporary classroom space for Horton Academy, a Baptist Institution. |
1838-1844 |
Attic? |
The area may have been used as a school or seminary for young ladies. |
Date Unknown |
Attic |
The flooring boards - which unexpectedly run north-south - were lifted in this unfinished attic, perhaps first when a loose-fill insulation was installed upon a polyethylene sheathing between a series of unusual, perhaps modern, set of east-west attic joists (Note that the sheathing does pass over these joists and that these joists (c. 1-1/4 inches wide x c. 6 inches deep) appear to have been cut with a circular saw). |
Pre-1995 |
Room 302 /South West |
*The west chimney was re-built in new, non-historical, high fire, brick work, from about 4 feet above floor level and continued through the roof. |
Pre-1995 |
Room 302 /South West |
* The flue had opened up. |
Post-1995 |
Room 302 /South West |
The open flue was closed off [CHECK IF THIS HAPPENED POST 1996]. |
Pre-1995 |
Area 301 /South East |
*The east chimney, which was parged [rendered] below, was re-built at the top in new, non-historical, high fire, brick work that continued through the roof. |
Pre-1995 |
Area 301 /North East of Chimney Stack |
*Remnants of a painted finished room in the north-east corner reaching to the north side of the chimney. |
Pre-1995 |
Area 301 /North East of Chimney Stack? |
*An earlier opening on the north face of the east wall was later simply clapboarded over without a sheathing insert. |
Pre-1995 |
Area 301 /North East of Chimney Stack |
*The sash was replaced. |
Pre-1995 |
Area 301 /North East of Chimney Stack |
A top layer of flooring boards was installed. |
Pre-1995 |
Area 301 /South East |
*The sash was replaced. |
SOUTH ELL
Date |
ELEMENT Common Name/Room Number/Geographic Location |
Upgrade/Repair |
|
|
|
|
EXTERIOR WALLS |
|
|
|
|
Pre-1984 |
West Facade, South Facade, East Facade |
A new rectangular addition with shingled walls. |
Pre-1995 |
South Facade |
*Work on the sills at the back took place. |
Pre-1995 |
South Facade |
*Plywood was installed as a finish to the repaired sills at the back. |
Pre-1995 |
East Facade |
*The installation of an east pitch roof gutter with its downspout. |
Pre-1995 |
West Facade |
*The installation of a west pitch roof gutter with two downspouts. |
Post-1995 |
South Facade |
Installation of exterior doorway to Room 106. |
Pre-1995 |
South Facade |
Installation of exterior doorway to Room 106. |
Unknown Date |
South Facade |
The Ell has settled and distorted the doorframe to Room 106, requiring a triangular piece to be inserted at header level. |
|
EXTERIOR |
|
|
|
|
[1994] |
West Pitch |
[*Completely re-sheathed ] |
[1994] |
East Pitch |
[*Completely re-sheathed] |
1994 |
East Pitch |
*The moisture problem which once existed between the east pitch of the roof and the south window of Room 203 was resolved, perhaps with proper flashing. |
|
|
|
|
FIRST FLOOR |
|
|
|
|
Pre-1984 |
Pantry /Room 104/ South East |
Creation of this room from the re-use of historic boards. |
Pre-1984 |
Back Porch (Hall) /Room 105 /South |
Creation of this room from the re-use of historic boards. |
Pre-1995 |
Pantry /Room 104 /South East |
*A patch was placed on the ceiling over the pantry door following water damage. |
Pre-1995 |
Back Porch (Hall) /Room 105 /South |
*The bottom wall boards were replaced. |
Pre-1995 |
Back Porch (Hall) /Room 105 /South |
*Installed were new floor boards, running east-west. [Note: This may be in error and the reference was to Room 107, though here the boards run north-south] |
|
|
|
|
Attic |
|
|
|
|
Date Unknown |
- |
New rafters were added. |
NORTH ENTRANCE PORTICO (PORCH)
Date |
ELEMENT Common Name/Room Number/Geographic Location |
Upgrade/Repair |
|
EXTERIOR WALLS |
|
|
|
|
c. 1947 |
North Facade, West Facade, East Facade |
*A new portico was added. It perhaps replaced an earlier Portico. |
Pre-1949 |
West Facade, East Facade |
Side latticework was installed. |
|
|
|
|
DECK |
|
|
|
|
1993 |
North Deck |
The deck was replaced. |
|
|
|
|
STEPS |
|
|
|
|
1993 |
North Steps |
The steps were replaced. |
|
|
|
HARDWARE
Date |
ELEMENT Common Name/Room Number/Geographic Location |
Upgrade/Repair |
|
|
|
Date Unknown |
Main House |
Removal of original hardware from assorted doors. |
Date Unknown |
Main House |
Removal of replacement hardware from assorted doors. |
Date Unknown |
Main House |
Installation of window locking hardware. |
Pre-1995 |
Main House and South Ell |
Assorted styles of 6 over 6 and 2 over 2 storm windows have been installed over time |
Pre-1995 |
Main House |
Installation of basement storm windows (plus bars on east window). |
Pre-c.1995 |
Portico, North Steps |
Dual metal hand-rails (pipe rails) were installed. |
|
|
|
PAINTING, WALLPAPERING, AND INTERIOR FINISHES
Date |
ELEMENT Common Name/Room Number/Geographic Location |
Upgrade/Repair |
|
|
|
|
EXTERIOR |
|
|
|
|
Pre-1949 |
Main House |
The house was painted white with a darker (green?) trim |
Pre-1949 |
Portico |
The portico was painted white with a darker (green?) trim |
1997 |
Main House |
House painting was undertaken in white |
2003, Summer |
Main House |
The east and west sides were scraped, cleaned, caulked and primed in white, and the windows were refurbished. |
2004, Summer |
Main House |
The north and south sides were scraped, cleaned, caulked and primed in white, and the windows were refurbished. |
2005 |
Main House |
All sides were painted in dark yellow ochre with white trim. |
|
|
|
|
INTERIOR |
|
Date Unknown |
Room 001 |
The brick foundation portion was perhaps rendered before being whitewashed. |
Date Unknown |
Room 001 |
The perimeter walls, face of ground sills, and the fireplace bases were all whitewashed at one time - as was perhaps the ceiling in the west section. |
Pre-1995 |
Main House |
Assorted rooms had their floors painted. |
Pre-1995 |
South Ell |
Assorted rooms had their floors painted. |
Pre-1995 |
Main House |
*Oil cloth applied to floors of the second floor, with the original painted perimeter left in place. |
Pre-1995 |
Area 301 /North East of Chimney Stack |
*Remnants of a painted finished room in the north-east corner reaching to the north side of the chimney. |
Pre-1995 |
Main House |
Assorted painting projects. |
Pre-1995 |
Main House |
Assorted wallpapering projects. |
UTILITIES
Date |
ELEMENT Common Name/Room Number/Geographic Location |
Upgrade/Repair |
|
|
|
Date Unknown |
Main House |
The fireplaces were reconfigured for coal/wood-fire burning inserts. |
Date Unknown |
Main House |
The removal of coal/wood-fire burning inserts. |
Date Unknown |
Main House |
Installation of fireplace dampers. |
Date Unknown |
Main House |
System of cast iron stoves and stove piping installed. |
Date Unknown |
Main House |
System of cast iron stoves and stove piping removed. |
Pre-1995 |
Room 001/ South East of Stairwell |
Cement base for a central heating system installed. |
Pre-1995 |
Room 001/ South East of Stairwell |
Central heating system upon cement base was removed. |
Date Unknown |
Main House |
Installation of the first central heating system (hot and return air registers on first and second floors?) - By 1927, east chimney? |
Date Unknown |
Room 001/ South West of Stairwell |
[Current] heating system was installed including forced air ductwork [and vents?] |
Post-1995 |
Room 001/ South West of Stairwell |
The oil tank was moved from the exterior to the interior through a concrete opening. |
1920s? |
Kitchen /Room 103 /South East |
The Kitchen sink was installed. |
c. 1927 |
Main House |
Plumbing services added for Room 204 as a bathroom. |
c. 1927 |
Main House |
Electrical services installed. |
Date Unknown |
Main House |
Electrical services upgraded. |
Date Unknown |
South Ell |
Electrical services installed. |
Date Unknown |
Exterior Wall, South Facade |
Installation of south west Canlet light fixture. |
Date Unknown |
Exterior Wall, North Facade |
Installation of an electrical outlet. |
Pre-1995 |
Exterior Wall, North facade |
Installation of present exterior light above the central doorway. |
Pre-1995 |
East Facade |
Installation of an exterior water faucet. [CHECK IF WATER FAUCET] |
Post-1995 |
East Facade |
Installation of a replacement exterior water faucet. |
2000 |
Main House |
Hot water installed. |
2004 |
Room 302 /South West |
[Ventilating] fan installed [to exhaust moisture and odors]. 1705 cfm (Based on 6ACH [air changes per hour ] for attic and second floor). It has thermostat (ON/OFF) control and a manual speed downturn rheostat. |
2008 |
Room 001/ South West of Stairwell |
Installation of the Humidex Ventilation System to reduce humidity levels. |
LANDSCAPE
Date |
ELEMENT Common Name/Room Number/Geographic Location |
Upgrade/Repair |
|
|
|
September 1977 |
North Side of House |
*Site boundaries: Reviewed with copies given to the Town of Wolfville and all adjoiners. |
September 1977 |
West Side of House |
*Site boundaries: Reviewed with copies given to the Town of Wolfville and all adjoiners. |
September 1977 |
South Side of House |
*Site boundaries: Reviewed with copies given to the Town of Wolfville and all adjoiners. |
September 1977 |
East Side of House |
*Site boundaries: Reviewed with copies given to the Town of Wolfville and all adjoiners. |
SOURCES
· Wolfville Historical Society Newsletter, Volume 04:2, September, 2004
· Wolfville Historical Society Newsletter, Volume 04:3, December, 2004
· Wolfville Historical Society Newsletter, Volume 06:2, June, 2006
· Wolfville Historical Society Newsletter, Volume 06:3, September, 2006
· Writings of Graham Patriquin
· c. 1949 photograph of Room 101 - http://wolfvillehs.ednet.ns.ca/history.htm
· 1949 photograph of Randall House - http://wolfvillehs.ednet.ns.ca/history.htm
· 2008 exhibit description: The Patriquins: "The rooms were cleaned and cleared of rubbish - 11 barrows loads of ashes were wheeled out of the kitchen as the house was made habitable for its new owners. Electric wiring was installed and a bathroom created by partitioning the old kitchen chamber."